Concrete footings in Loma Linda CA - a solid base built for what it holds up
A sinking post or a new wall needs a footing built for its load, poured on ground we've dug out and packed firm.

- Licensed and fully insured.
- Free quotes on site.
- We reply within 1 business day.
What goes into building a concrete footing under a wall, post or slab?
A concrete footing is the wider base under a wall, post or column that spreads its weight into the soil. In Loma Linda we build footings on their own or as the first step of a block wall, deck, patio cover or slab.
Most people call us because something is about to be built, or because a post or wall they already have has started to lean. The price mostly depends on three things: what the footing holds up, how many footings the job needs, and how a concrete truck can reach the spot. The schedule usually turns on the permit question and on what we find once we dig. Whether a permit is needed is the city's call, so we check with its office instead of guessing, and if one is needed we take care of the application. You'll get your own figure from the estimate after I've seen the site.
How do you know a wall or post needs a better footing?
Deck posts sinking or tilting
A post that has dropped, leans, or sits on a small block in the dirt usually never had a proper footing to spread its load. If you leave it, the deck above keeps shifting and the boards and fasteners take the strain.
Cracks along a wall's base
Stepped cracks or a lean in a block or garden wall often trace back to a footing that's too small or has moved. The longer it goes, the wider the cracks get and the harder the repair becomes.
Water pooling by the base
Water that stands against a wall or post after rain, or ground that slopes back toward it, keeps the soil under the footing wet. Over time, that is often how a sound footing starts to settle.
Work that often goes with footings
Foundation raising
When an existing wall, post or slab has sunk or tipped, lifting it back to level can make more sense than building a fresh footing beside it.
Concrete cutting
A footing under an existing patio, driveway or garage floor needs a clean opening, and saw cutting leaves straight edges that patch neatly afterward.
How we build concrete footings
I begin by asking what the footing has to hold up, a full wall or a single post, and how a concrete truck can reach the spot, because both shape how we build it and what it costs. From there we mark the layout and dig down to firm ground instead of raking loose dirt flat. Then we set the forms, pour and finish the concrete, and clean up so the area is ready for whatever goes on top. A footing is buried the day it's poured and nobody ever admires it, which is exactly why I'd rather take the time on the digging than rush the job to make it look quick.
Footings often come with other work. When the new footing has to go through an existing patio or slab, concrete cutting lets us open a clean, straight section instead of breaking out more than we need. If an older wall or slab nearby has already settled, it's worth asking whether foundation raising should come first, before anything new is tied to it.
Continuous footing for walls
This kind of footing runs the full length of a wall, so it suits block walls, garden walls and the edge of a structure, where the weight spreads along a line. Footing guides match walls to this type for that reason.
Pad footing for posts and columns
A pad sits under one concentrated load, such as a deck post, pier or column. It suits patio covers, decks and anything else that rests on a few points.
Thickened slab edge
Here the footing is built as part of a floor slab and goes in with the same pour. It can suit some slab projects, like a shed or patio slab, when we're pouring the floor anyway.
Get a written estimate for your concrete footing
Send the form and we'll reply within one business day to set a time for me to come out. The on-site estimate is free and obligation-free, and calling (909) 760-1346 works too.
Call (909) 760-1346Why Loma Linda homeowners call Loma Linda Concrete for footings
The owner writes every estimate
I come out to look at every job and write the estimate myself. Then I work on site beside our small crew, who do the forming, pouring and finishing, so the person who saw your ground is there when the concrete arrives.
We're licensed and fully insured
We're licensed and fully insured. The state's license board describes concrete contractor work as forming, pouring, placing and finishing concrete, and that's the work our crew does on every footing.
Learned beside experienced finishers
I learned this trade working beside experienced finishers before I opened the business in 2023. We're based in Loma Linda and many of our calls come from people we've already worked for, so if your city isn't named on the site, please call and ask.
Honest limits, explained before pouring
I'd rather tell you plainly what concrete can and can't do before we start than have you find out later. Satisfaction guaranteed on every job.
On a footing, the work that counts most is the part you won't see once it's buried. When you're ready, request a site visit or call (909) 760-1346.
What happens after you call about a footing?
Call or send a request
Thank you for reaching out. It helps if you can tell us what the footing will carry, the property address and how a truck can reach the spot, so we can set a time for me to come out.
I visit and write the estimate
I look at the site, ask how you'll use what goes on top and leave you a written estimate. It sets out what the price covers, so no part of the job is left as a guess.
We handle permits and groundwork
Once you're ready, we sort out the permit side if there is one, then dig out and form the footing. Nothing gets poured until the ground and the forms are right.
We pour, finish and walk it
Our crew pours and finishes the concrete and cleans up the site. Then I walk the finished work with you before we call the job done.
Common questions
How much do concrete footings cost in Loma Linda?
There's no single price for a footing. The cost depends on what it holds up, how many footings the job needs and how a concrete truck can reach the spot. If the truck can't get close, wheelbarrowing the concrete in or bringing in a pump adds labor or equipment cost, and I'll show you how that affects your job when I come out.
Do I need a licensed contractor for a small footing job in California?
Often, yes. California's contractor license board says a license is required for minor work whenever that work needs a permit of any kind, even if the project is under $1,000. The same rule applies when an unlicensed person hires one or more workers, so even a small footing job can call for a licensed contractor.
How do I apply for a building permit in Loma Linda?
You apply through the city's Online Permit Portal, where you submit the application and electronic plans, pay fees and track progress. The city also publishes Building Standard Handouts for patios, block walls, retaining walls, garden walls and decks or balconies, which are worth reading if your footing sits under one of those. If your job needs a permit, we file it for you, as mentioned above.
How do I check if my Loma Linda address is in an earthquake hazard zone?
Type your address into the state's EQ Zapp tool. It shows whether the property lies in a mapped earthquake hazard zone and also tells you if the state hasn't evaluated that area yet. Inside its Zones of Required Investigation, state law requires a site-specific ground study before most developments for human occupancy can be permitted. Some single family homes are exempt, but local agencies can be stricter, so it's worth checking before we plan the footing.
Should I use bagged concrete or ready-mix for footings?
For a handful of deck-post footings, bagged concrete can be the economical choice, especially when access to the spot is tight. For many footings or a continuous footing, ready-mix from a truck usually wins on consistency and total cost, even with its delivery fee. I'll tell you which one fits your job at the estimate.
How do I keep water from damaging a new footing?
Keep water away from the soil around it. Start with ground that slopes away from the wall or structure, so rain runs off instead of soaking in at the base. Gutters or sprinklers that put water right beside a new footing are worth moving too.
Book a site visit for your footing
Getting the footing planned first means the wall, post or slab above it is built on a base you already understand.
